Shijiazhuang Hongsen Smelting & Casting Co., Ltd.Shijiazhuang, Hebei, ChinaDrawing-Based OEM Metal Casting ProgramsSince 2002

Upload Drawing

Send The Drawing First, Then Complete The Project Step By Step

For drawing-based metal casting projects, the best starting point is usually not a fully completed form. It is the drawing, sample photos, or the key technical package that lets the first review begin quickly.

2D drawing3D modelSample photosDrag and drop
Why This Flow Feels Closer To A Real Buying Process

RFQ Quick Reference

What information is enough to start the first review

The first RFQ does not need every technical detail to be final. Send the key files and project requirements first, then Hongsen can check whether the package is ready for quotation review.

Files

A 2D drawing, 3D model, sample photo, or existing part photo can be enough to start.

Project notes

Application, quantity, annual demand, material direction, machining scope, and inspection expectations make the first response faster.

First feedback

The first review usually checks material direction, casting route, machining focus, inspection risk, and missing information.

1

Current

Upload Files

2

Next

Project Details

3

Next

Contact & Submit

Step 1

Send The Drawing Files And References First

2D drawings, 3D models, and sample photos are all supported. Even one file is enough to begin the first review.

Step 1

Files

For industrial casting projects, buyers do not always have every detail fixed in the first RFQ. If the part includes a 3D model, complex internal geometry, lightweight structure, or prototype validation need, it can still be sent first for early review.

2D drawing3D modelSample photosDrag and drop

File Guidance

Large attachments may be rejected by mail servers. Keep the total attachment size within about 20 MB for the smoothest delivery.

  • Part name and application
  • Material direction and quantity

2D Drawing

Start with PDF, DWG, DXF, or a drawing scan

PDF / DWG / DXF

+

No file selected

Start with PDF, DWG, DXF, or a drawing scan

3D Model

Useful when the structure is more complex

STEP / IGS / X_T / STL

+

No file selected

Useful when the structure is more complex

Sample Photos

Photos still help when the full drawing package is not ready

JPG / PNG / WEBP

+

No file selected

Photos still help when the full drawing package is not ready

Initial review feedback is typically expected within about 24 hours when the drawing package is clear enough.
Why This Flow Feels Closer To A Real Buying Process

Why This Flow Feels Closer To A Real Buying Process

Why This Flow Feels Closer To A Real Buying Process

The request starts with files, then adds project details, then confirms the contact. That makes the page feel more like a sourcing workflow and less like an internal data form.

Files firstProject details secondContact confirmation last

Factory Proof

The Trust Signals Buyers Usually Check Before Sending Files

  • Manufacturing base operating since 2002 with multiple casting routes
  • Machining, inspection, and export coordination are part of the first review
  • When the package is clear enough, initial feedback usually begins within about 24 hours

Direct Contact

If Your Drawing Package Is Already Ready, You Can Also Send It Directly

The form helps structure the RFQ. If the buyer already has a clean drawing package, email or WhatsApp can also be used to start quickly.

What Hongsen Reviews First

The First Review Focuses On Technical Fit, Not Generic Sales Language

  • Which casting route likely fits the geometry best
  • Whether the material direction, machining scope, and inspection focus look reasonable
  • Which missing point matters most if the package is still incomplete

Good Projects For This Flow

These Project Types Usually Fit An Early Drawing Review Best

  • 2D or 3D drawing is already available
  • Casting, machining, and inspection need to be considered together
  • The program starts with a sample order or pilot batch first

Do Not Wait For Every Detail

The Review Can Still Start Even If The Final Grade Is Not Fully Locked

  • Application details and a likely material direction are often enough to begin
  • Quantity, annual demand, or inspection scope can still be estimated at this stage
  • Sending the drawing early usually moves the RFQ faster than waiting for a perfect package
WhatsAppEmailUpload